on and before 2021
Addition & Alteration Work
New Territories

Replacement of MVAC System at Admin Building for Section 10, 51 Tsing Yi, N. T.

Location

Admin Building, 51 Tsing Yi Road

Sector

Client / Main Contractor

Ecospace – Kam Shing Joint Venture

Project Period

March 2021 to December 2021

Description

Replacement of MVAC System (Air-cooled Chillers) at Admin Building (1 set @435kW, 2 sets @712kW)  